Client: Henco International
Location: Blackpool
Project size: 2600 sqm
Project Value: c. £2,400,000
Sector: Industrial
Project Overview
Wareing Buildings were tasked with delivering a new steel portal-framed industrial structure comprising multiple units designed as shell-only spaces. These units, intended for subsequent tenant-specific fitouts, would then be tailored to individual operational requirements.
Key Challenges
- Adverse Weather Conditions: While the project scope was relatively straightforward, prolonged wet weather during Winter 2023/24 introduced significant complications, particularly during the early construction phases.
- Tight Deadline: The client required a rapid turnaround due to a tight deadline set by the tenant, who had already given notice on their previous site – necessitating strict adherence to the construction schedule.
- Uneven Site Levels: The development site featured significant level differences. However, the presence of solid clay on-site provided an opportunity to implement a cost-effective cut-and-fill strategy.
Our Approach
- Temporary Drainage & Working Platform: To mitigate weather-related delays, we installed a temporary drainage system alongside a compacted aggregate platform. This maintained site accessibility and protected ground conditions throughout construction.
- Cut-and-Fill Strategy: A cut-and-fill approach was used to balance the site levels. Clay from the higher elevations was redistributed and compacted in layers to raise the lower areas. This method eliminated the need for costly spoil removal and aggregate importation. All earthworks were verified through plate load testing to ensure compliance with the required ground-bearing capacities. Structural design and soil compaction specifications were managed entirely in-house.
- Precise Project Scheduling: Working to a complex and demanding schedule, Wareing Buildings maintained exceptional attention to detail throughout.
- Key features included:
- Decorative cladding with a bespoke chessboard pattern
- Overhang roof detailing
- Fire-rated internal wall installations
- Roof safety line systems for future maintenance access
Outcomes & Cost Efficiencies
- Environmental and Cost Benefits: The cut-and-fill method significantly reduced the reliance on quarried aggregates and associated transportation, generating both cost savings and environmental benefits.
- Aesthetic Enhancements: Planning conditions discouraged monotone cladding, prompting our team to develop a unique chessboard cladding design that improved the visual impact of the building.
- Successful Delivery: Despite challenging weather conditions, the project was completed on time and within budget, demonstrating the effectiveness of our proactive planning and execution.
Client Testimonial
Chris Hibbert, Managing Director of Henco International, shared his experience with Wareing Buildings:
“Since 2013, Wareing Buildings have delivered seven developments for us, along with several repair and re-cladding projects over the years. Subject to pricing, we are hoping to appoint them for our eighth development in the coming weeks.
Our most recent project was a 28,000 sq ft trade counter development, part of which was pre-let to Howdens. We needed a complete, turn-key solution – and that is exactly what Wareing Buildings delivered.
One of the main challenges we faced was the weather – it was probably the wettest winter on record! Despite this, the Wareing Buildings team adapted to the difficult site conditions and kept the build on track to meet our contractual deadlines. Their problem-solving and commitment really stood out.
The whole team was excellent. Simon Tickle managed the initial quotation, Jason Worledge and Josh Newman oversaw the design and engineering, Chris Wareing handled site meetings and snagging, and Christine Whitby provided great support with contracts and documentation. The process was well-managed from start to finish.
Wareing Buildings are local, responsive, and reliable. If any issues arise during or after a build, I know they will be dealt with quickly and properly. That peace of mind is a big reason why we have continued to work with them – and why they remain our preferred construction partner.