Industrial Buildings: Design and build case studies

Weeton Church

Main image

thumb image

thumb image

thumb image

Click the images above to view

Weeton Church

Construction of disabled toilet within the existing church. All work carried out by our own in-house joinery department. The existing pews and staging were cut back, the new room constructed in stud-work and boarded on the outside using reclaimed pitch-pine to match the existing. The timber boarding on the rear gable wall of the church was stripped off, cleaned and refitted, with new timber used where necessary. The new work can be seen on two pictures, awaiting finishing with varnish, to match the adjacent pews. The third picture shows the church before work started.